Project | Contractor | Consultant | Supplied Panels | Qty | |
---|---|---|---|---|---|
1 | Bahra Cable Factory | Advanced Vision | Advanced Vision | MCC for Primary & Secondary Chilled Water (Using VFD's) 60KW & 95KW | 5 |
2 | Hidada Power Plant 2A & 2B Jeddah | Ziad Jamjoom Est. | Hidada Power Plant | 2 Manual Transfer Switch with Tie Switch 3200A with Capacitor Banks | 1 |
3 | Hidada Power Plant 2A & 2B Jeddah | Ziad Jamjoom Est. | Hidada Power Plant | Distribution Panel with Capacitor Banks | 14 |
4 | Saudi Glass Factory, Jeddah | Ziad Jamjoom Est. | Saudi Glass Factory | Manual Transfer Switch 2000A‐3P (ACB) | 1 |
5 | Saudi Glass Factory, Jeddah | Ziad Jamjoom Est. | Saudi Glass Factory | Distribution Panels | 10 |
6 | Saudi Glass Factory, Jeddah | Ziad Jamjoom Est. | Saudi Glass Factory | Motor Control Centre 63KW | 5 |
7 | Al Sorayai Carpet Factory, Jeddah | Ziad Jamjoom Est. | Al Sorayai Carpet Factory | Distribution Panels & Modification Works | 3 |
8 | Ummal Qura Printing Press, Makkah (Extension Project) | MOBEST | Ministry Of Culture & Information | MDB 1200A,ECB 600A, ATS 1200A & Lighting Control Panels | 8 |
9 | Hajj Terminal | Advanced Vision | Ministry of Interior | MCC for Primary & Secondary Chilled Water (Using VFD's) 355KW | 4 |
10 | King Abdullah Private Villa ‐ Riyadh | Advanced Vision | Dar Al Handasah | MCC for Primary & Secondary Chilled Water (Using VFD's) 100KW & Fire Pump Control Panel | 5 |
11 | KAAU, Jeddah | Honeywell Truki Arabia | Automation Control Panels | 17 | |
12 | Shoaiba Power Plant ‐ P1/ 2, Stage 2 | Honeywell Truki Arabia | Juffaili Co. | MCC & Automation Control Panels | 20 |
13 | King Abdul‐Aziz Endowment Project (Dokaae ‐ Makkah) | ASEM (Morex) | Dar Al Handasah | MCC for Lift Station 30KW to 160KW (Using Soft Starter) | 19 |
14 | HRH Prince Saud bin Naïf Palace ‐Jeddah | Talul Contracting Co. | Talul Contracting Co. | Main Distribution Panels & ATS 800A | 7 |
15 | Hada Military Hospital ‐ Taif | MOBEST | Hada Military Hospital | Supply & Installation MCC Panels & CCTV System | 23 |
16 | Marriot Hotel ‐ Makkah | Beout Makkah | MCC Control Panels | 20 | |
17 | Meridian Hotel – Makkah | Beout Makkah | MCC Control Panels | 12 | |
18 | KAIA (Housing Extension) | Al Mabani General Contracting | Dar Al Handasah | Changeover Switch 800A & Normal | 1 |
19 | KAIA (Monitoring Room) | Al Mabani General Contracting | Dar Al Handasah | Normal & Emergency Control Panel Using PLC | 2 |
20 | Khalidia Palace (Amir Sultan Palace) | MTTS | Dar Al Handasah | MCC & BMS Control Panels | 7 |
21 | Joaf Airport | Al Qussie International | General Authority of Civil Aviations | MTS 3200A | 1 |
22 | Hail Airport | Al Qussie International | General Authority of Civil Aviations | MTS 3200A | 1 |
23 | Jizan Airport | Al Qussie International | General Authority of Civil Aviations | MTS 3200A | 1 |
24 | Hafof Airport | Al Qussie International | General Authority of Civil Aviations | MTS 3200A | 1 |
25 | Yanbu Airports | Al Qussie International | General Authority of Civil Aviations | MTS 3200A | 1 |
26 | Yanbu Royal Commission | Fawaz Group | Royal Commission | MCC & AHU Control Panels | 7 |
27 | SEC (Substation) KM‐ 14 (Jeddah) | Marian Services Co. | SCECO | Changeover Switch 600A for AHU's | 1 |
28 | SEC (Substation) Ruwais (Jeddah) | Marian Services Co. | SCECO | Changeover Switch 600A for AHU's | 1 |
29 | SEC (Substation) Rehab (Jeddah) | Siemens (Power Transmission & Distribution) | SCECO | Changeover Switch 600A for AHU's | 1 |
30 | SEC (Substation) Bawadi (Jeddah) | Siemens (Power Transmission & Distribution) | SCECO | Changeover Switch 600A for AHU's | 1 |
31 | SEC (Substation) Aziziah (Makkah) | Siemens (Power Transmission & Distribution) | SCECO | Changeover Switch 600A for AHU's | 1 |
32 | Yanbu‐Rabigh Pipe Line | Saudik Contracting Co. | Saudi Aramco | Battery Disconnect & Alarm Panels + 48VDC Load Disconnect Panel | 4 |
33 | Taif Airport | Rajab & Silsilah | General Authority of Civil Aviations | ATS 630A | 1 |
34 | Al Fakeer Hospital ‐ Madinah | Samman Co. | Ministry of Health | ATS 630A | 1 |
35 | Al Mahad Hospital ‐ Madinah | Samman Co. | Ministry of Health | ATS 630A | 1 |
36 | Abruq Al Ragamah | Samman Co. | Baladiyah Engineering Dept. | MDB, ATS & Control Panels | 8 |
37 | King Fahad General Hospital ‐ Madinah | Samman Co. | Ministry of Health | Replacement of Distribution & Control Panels | 68 |
38 | MADA Stretch Film ‐ Jubail | Saudi TKT | MADA | Motor Control Centre 30KW | 2 |
39 | Saudi German Hospital ‐ Madinah | Saudi German Hospital ‐ Madinah | Saudi German Hospital ‐ Madinah | ATS 630A | 1 |
40 | Saudi Investment Bank ‐ ABHA | Al Noor Al Raki Co. | PROJACS RIYADH | MDB, ATS, SCECO & Lighting Panel | 4 |
41 | Saudi Investment Bank ‐ TABUK | Al Noor Al Raki Co. | PROJACS RIYADH | MDB, ATS, SCECO & Lighting Panel | 4 |
42 | Saudi Investment Bank ‐ Jeddah Al SAFA Branch | Office of Contracting | PROJACS RIYADH | MDB, ATS, SCECO & Lighting Panel | 4 |
43 | Saudi Investment Bank ‐ Jeddah Al Bawadi Branch | Office of Contracting | PROJACS RIYADH | MDB, ATS, SCECO & Lighting Panel | 4 |
44 | Saudi Investment Bank ‐ Jeddah Hai Al Jamea | Office of Contracting | PROJACS RIYADH | MDB, ATS, SCECO & Lighting Panel | 4 |
45 | Tahlya Water Plant | Office of Contracting | National Water Company J.C.B.U | MDB & Distribution Panels | 5 |